Migrating from Asana Enterprise Legacy to Current Enterprise (A Complete Guide)
This comprehensive guide walks you through the complete migration process and post-upgrade verification steps.
Overview
Organizations on Asana's Enterprise Legacy plan can upgrade to the current Enterprise plan at no additional cost, unlocking 20+ new features including AI capabilities, universal workload management, and enhanced security controls. This comprehensive guide walks you through the complete migration process, and post-upgrade verification steps.
What You Gain in the Migration
| Feature Category | Legacy Enterprise | Updated Enterprise | Migration Impact | 
|---|---|---|---|
| AI Features | Not Available | Unlimited AI Actions + Smart Features | New Capability Unlocked | 
| Universal Workload | Limited Portfolio View | Cross-Project Resource View | Enhanced Visibility | 
| Workflow Bundles | Not Available | Standardized Process Templates | New Capability Unlocked | 
| Capacity Planning | Basic Resource View | Forward-Looking Scenario Planning | Enhanced Planning | 
| Service Accounts | Not Available | Full-Scope API Tokens | New Capability Unlocked | 
| Admin Announcements | Not Available | Org-Wide Banner Communications | New Capability Unlocked | 
| Custom Branding | Limited | Full Logo/Color Customization | Enhanced Branding | 
| Mobile App Controls | Not Available | Screenshot/Copy Prevention | New Security Controls | 
| Guest Invite Permissions | Basic | Granular External Collaboration | Enhanced Security | 
Migration Process & Timeline
Phase 1: Pre-Migration (Day 0-1)
- 
Submit upgrade request through Customer Success Manager (Cirface) 
- 
Review current seat count and plan cleanup if needed 
- 
Notify IT team of upcoming changes 
Phase 2: Migration Execution (Day 1-3)
- 
Asana Support processes backend plan switch 
- 
Plan label changes from "Enterprise Legacy" to "Enterprise" in Admin Console 
- 
New features become available in UI menus 
Phase 3: Post-Migration Verification (Day 3-7)
- 
Verify all integrations (Zendesk, Teams, etc.) continue functioning 
- 
Test SAML/SCIM authentication flows 
- 
Enable AI features in Admin Console if desired 
- 
Validate new features are accessible to appropriate users 
Integration Compatibility Assessment
| Integration Type | Expected Behavior | Action Required | 
|---|---|---|
| SAML/SCIM Authentication | Continues without interruption | None - existing configs carry over | 
| Zendesk Integration | May prompt OAuth re-authentication | Re-authenticate if login fails | 
| Microsoft Teams/Slack | Existing webhooks remain active | Test notifications post-migration | 
| Power BI/Tableau | Built-in connectors unchanged | Refresh datasets to verify connectivity | 
| Custom API Scripts | Token scopes remain identical | Monitor for any error responses | 
What Moves to Enterprise Plus
Important Note: Some features from Legacy Enterprise now require Enterprise Plus:
- 
Audit Log API - SIEM integration capabilities 
- 
Data Loss Prevention integration 
- 
eDiscovery integration support 
- 
HIPAA Compliance controls 
- 
Enterprise Key Management (customer-controlled encryption) 
- 
Data Residency choice (EU, US, Japan, Australia) 
Evaluate whether these advanced compliance features are critical before proceeding.
Post-Migration Feature Enablement
AI Features Activation:
- 
Navigate to Admin Console > Settings 
- 
Locate "AI Features" toggle 
- 
Enable organization-wide or by team 
New Admin Controls:
- 
Universal Workload: Automatically available in Reporting section 
- 
Workflow Bundles: Accessible via Project Templates 
- 
Service Accounts: Admin Console > Apps > Service Accounts 
- 
Guest Permissions: Admin Console > Security > Guest Management 
Risk Mitigation & Rollback Planning
Minimal Risk Migration:
- 
Backend-only changes with no data modification 
- 
User sessions remain active during switch 
- 
Existing project structures unchanged 
- 
All custom fields and workflows preserved 
If Issues Arise:
- 
Contact Asana Support immediately for investigation (Cirface will support) 
- 
Document specific error messages or failed authentication attempts 
- 
Legacy Enterprise plan cannot be restored once migration completes 
- 
Focus on fixing integration authentication rather than rollback 
Success Metrics & Verification Checklist
✅ Migration Complete When:
- 
Admin Console shows "Enterprise" (not "Enterprise Legacy") 
- 
AI features appear in project toolbars (if enabled) 
- 
Universal Workload accessible in Reports section 
- 
All integrations authenticate successfully 
- 
Users can access new Workflow Bundles 
- 
Service Accounts can be created in Admin Console 
📊 Measure Success:
- 
Time to resolve any integration re-authentication: <24 hours 
- 
User adoption of new AI features: Track via Admin Console insights 
- 
Workflow efficiency gains from new features: Monitor project completion rates 